Each of these was performed by a maintenance company or utility operating a Paragonix Tek robotic system. The numbers below are theirs, taken from project records and, where quoted, from their own written accounts.
Salem, Massachusetts · 2002
Foley Hill reservoir, first cleaning since construction
A concrete underground reservoir built in the early 1900s, and the primary storage for the entire city system. Existing methods were judged unsafe, expensive and too slow. The reservoir was cleaned and prepared for repair while remaining in service.
The method kept the tank in service providing storage, adequate pressure and fire protection for a major part of our distribution grid — without the worry of introducing personnel into the tank.
Stanley I. Bornstein, P.E., City Engineer, City of Salem
Project duration
76 days on site
Material discharged
8.2 million gallons
Distance to discharge
4,800 ft from the access hatch
Turbidity, highest reading
0.232 NTU, during a non-operational period
Sediment depth
0.5 m average, 1.2 m at the inlet piping
Severn Trent Water, United Kingdom
First UK deployment, utility-supervised trial
The utility ran a controlled trial at an isolatable site before approving the method. Equipment was confirmed acceptable under DWI Regulation 25, disinfected before entry, and wastewater dechlorinated before discharge. Turbidity was monitored continuously at the outlet to customers throughout.
After the trial the reservoir was drained and physically inspected. I was particularly impressed by the way all sediment had been completely removed over the cleaned area, even around the bases of the many circular columns supporting the roof.
Severn Trent Water trial report
Turbidity, trial site
0.5 NTU maximum, 0.25 average
Turbidity, main site
0.6 NTU maximum, 0.27 average
Against utility cut-off
Fifteen times below the limit they had set
Bacteriological samples
Clear before and after, both sites
Main site duration
Completed online in one day
Highland, Indiana
Two five-million-gallon tanks, one mobilisation
Both tanks cleaned in a single mobilisation, in less than thirty-six total hours on site — the case that shows what the method does to schedule when the tanks are straightforward.
Tanks
2 × 5 MG
Total time on site
Under 36 hours
Kansas City, Missouri
Filter sand removal from an operating clearwell
Twenty-five cubic metres of filtration sand removed from a clearwell without taking the plant down.
Material removed
25 m³
Plant status
Fully operational throughout
Cobb County, Marietta, Georgia
Filter well recovery at a working plant
Fifty cubic metres of filter sand removed from a filter well while the plant continued to operate.
Material removed
50 m³
Plant status
Fully operational throughout
Offshore · March 2022
First in-service cleaning on an active offshore platform
Inspection and cleaning of a water storage tank while it remained in service on a producing platform — the environment where taking an asset down is least acceptable and mobilising a conventional crew costs the most.
First of its kind
March 2022
On record
Recorded from the first pass to the last.
Every run is recorded through the on-board camera, and sonar tracks removal performance
as the work proceeds. The asset owner receives the condition of the floor before the work
started and after it finished, not an assurance that it went well.
Video here — 16:9
Project footage montage. Before and after floor condition from the on-board camera, sonar removal performance, topside deployment.
Suggested length: 2–3 minutes
Operating companies
Maintenance companies running Paragonix Tek systems.
These companies operate our equipment as part of their own service business. The customer
relationship, the contract and the work are theirs.
United States
Logo
US Submergent Technologies
Florida. Added robotic potable water tank cleaning to an established wastewater and stormwater cleaning business, and now delivers both.
Logo
Sciphyn
Operates multiple Paragonix Tek systems, adapted in-house for its own service work. A customer, not a competitor.
United Kingdom
Logo
Severn Trent Water
First deployment in the United Kingdom, approved after a utility-supervised trial with continuous turbidity monitoring at the outlet to customers.
Netherlands
Logo
A.Hak Industrial Services
Operates a Paragonix Tek system built for hazardous-area work, and applies it across tank inspection and cleaning for industrial clients.
Logo
Quasset
Robotic validation partner.
Brazil
Logo
ASP Serviços Industriais
Itu, São Paulo. Delivers inspection and cleaning of tanks and reservoirs in operation using remotely operated vehicles, including firewater tanks under NFPA 25.
Asset owners
Tanks maintained with the technology.
These organisations own or operate assets that have been inspected, mapped, cleaned or
scanned using Paragonix Tek robotic systems.
LogoMiami-Dade WaterFlorida, USA
LogoLubrizolCleveland, Ohio and Deer Park, Texas, USA
LogoKansas City WaterMissouri, USA
LogoCobb CountyMarietta, Georgia, USA
LogoHighland Park WaterIndiana, USA
LogoCity of SalemMassachusetts, USA
LogoFrederick WaterMaryland, USA
LogoShaler Water WorksPennsylvania, USA
LogoEast Deer TownshipPennsylvania, USA
LogoSan Diego Water AuthorityCalifornia, USA
LogoOld Dominion Power and LightVirginia, USA
LogoPfizerPuerto Rico
LogoBraskemUnited States and Brazil
LogoBPSarnia, Canada
Robotic systems supplied by Paragonix Tek. In every project and reference listed, the
inspection, cleaning and measurement work was carried out by the maintenance company or
utility operating the equipment. Paragonix Tek builds and supports the technology.
Start with the application
Have a similar application?
If one of these looks like a tank you service, tell us about yours. Similar does not mean identical, and the differences are usually where the engineering is.